Nowadays, many organizations are thinking about implementing an Earned Value Management System (EVMS). With the wide variety of solutions in the market, not to mention different business requirements and budgets, the choice may not be that easy. Generally speaking, the search results should translate into defining the most effective price/functionality ratio for your company. So what is EVM anyway? That’s precisely what we’re going to find out in this article. Let's start with the basics.
How to apply the earned value method
When selecting EVM software, it's vital to understand why and how the concept of EVM exists and operates in the first place. Regardless of the solution you have chosen, you must:
- define in detail the content of the project;
- create and save a basic project schedule;
- draw up and hold a baseline plan for the cost of the project.
These elements are of critical importance for the reason that if, for example, an estimate says that 20% of the work has been completed, and the content of the work is not fully determined, then the accuracy of such an estimate is low, since this estimate is based on an incompletely defined content of the work. An orderly and adequate application of the work breakdown structure (WBS) can help gain a correct understanding of the fully defined project scope.
With a baseline schedule, each task will be accurately described in terms of its start and finish, as well as duration. Together with an approved cost baseline, this information determines the time and costs to complete the job. As the project unfolds, the actual work performed is evaluated, and the project's earned value is determined.
Summarizing the information, we can say that EVA requires a completely defined project scope.
Key quantities that operate in this method:
- The planned cost of planned works (PV aka Planned value);
- The planned cost of work performed (EV or Earned Value);
- The actual cost of the work performed (AC - Actual Cost);
- The planned cost of the entire project.

The benefits of EVM
With all this info, one question stands from the rest. What are the main benefits the adoption of a project management strategy brings?
- Thorough upfront planning;
- Complete understanding of your project's current status versus what's been planned;
- Better project management;
- Increased employees' effectiveness;
- Faster detection of problem areas;
- Increased team's flexibility.
Tips on selecting the right software
When selecting EVM tools, the first thing you need to do is to enumerate the goals and objectives you're pursuing in a project. Secondly, you have to understand the needs of those who will use the potential system within your team. The checklist should contain all the actual and future project management processes.
The third step is to consider a detailed set of IT guidelines, standards, and integration needs. With such preparation, it gets easier to evaluate an EVM system that suits your needs. A fully operational EVM solution generally includes the following features:
- The scheduling engine;
- A project cost management tool;
- The variety of BI (Business Intelligence) tools;
- Integration with business systems (such as accounting, ERP, etc.).
As said earlier, there are several systems in the market to consider when selecting an EVMS solution. The question boils down to choosing the right components, and especially scheduling and cost engines. So how can you decide which system works best for your company?
With your particular needs in mind, we advise you to conduct a decision matrix analysis and find out some of the most common standards for EVMS. This method allows evaluating different options against the critical criteria for your business. You can read more about a sample decision matrix using this link.
Tips on comparing the components of an EVMS
Earned Value Management solutions are integral in regards to budgeting, analyzing performance, and actual costs of a project. One-size-fits-all solutions are non-existent, so it’s essential to evaluate your specific needs before picking up a system. This way, one should consider all the objectives for the system.
When selecting an EVMS, it's vital to know what exact components your team needs. Below you'll find some essential considerations to be aware of.
- The system should provide the tracking of multiple projects simultaneously;
- One should be able to record planned and actual expenses;
- The scheduling engine (both built-in and extension) must record risks associated with project activities;
- The system should be web and mobile-friendly;
- Be sure to know whether EVMS components can be integrated and connected with other solutions you're using;
- Make sure the potential system provides convenient EVM analysis, reports, alerts, and status indicators;
- Find out how easy it is to familiarize yourself with the system. Does your vendor provide training courses? Find out;
- The system should allow creating steps or sub-activities that count towards the percent complete of the leading activity;
- Make sure the components comply with EIA-748 standard requirements.
The free earned value management template by Akveo
Here at Akveo, we developed the project management template that correctly measures a project's PI (performance index) and progress. The template allows project managers to compare costs to a budget based on the project development schedule.
Using the Earned Value Management Template, it’s possible to detect issues early, and estimate costs considering actual progress. This method is especially vital when you’re short on budget.

By filling out the template following each development stage, it gets easier to evaluate budget variance per each feature, the cost performance index and enhance the projected timeline. The earned value spreadsheet template ensures that your projects will be delivered both on schedule and budget.
To Sum Up
Nowadays, several EVM solutions in the market come in real handy at all levels of EVM. The basic functionality runs from measuring project performance and ensuring regulatory compliance to precise calculations and keeping all the data organized. With a proper earned value management solution at hand, one may answer the following vital questions:
- What was the project's square one?
- What is the ongoing status of the project?
- Where is the project heading to?
EVM systems help project managers check the current status of the ongoing project in comparison with the initial plan. In all, project management software always boosts productivity and ensures better results, so you don't have to worry about delays or errors. Indeed, EVM systems are industry-wide. For instance, Mark Stringer, the director of PMO at Aston Martin, claims that EVMS "helps to realize if a process or an employee is heading in the wrong direction, so it's easier to identify and fix mistakes early."
If you’d like the summary of all the info you've just read, EVM is all about staying on budget and time. And if you do, it gets a lot easier to make timely adjustments and be in control. This way, you have more chances to assume that your project will be successful.
P.S. Apart from the Earned Value Management Template, you might be interested in some of our related solutions:
Streamlining Gifting Marketplace Operations with Retool
Afloat, a gifting marketplace, needed custom dashboards to streamline order management, delivery tracking, and reporting while integrating with Shopify and external APIs.
The solution:
We built two Retool-based dashboards:
- A Retail Partner Dashboard embedded into Shopify for managing orders and store performance.
- An Admin Dashboard for handling deliveries and partner data.
Both dashboards included real-time integration with Afloat's Backend and APIs for accurate, up-to-date data and scalability.
The result: enhanced efficiency, error-free real-time data, and scalable dashboards for high-order volumes.
Billing Automation for a SaaS Company with Low-Code
Our client needed a robust billing solution to manage hierarchical licenses, ensure compliance, and automate invoicing for streamlined operations.
The solution:
We developed a Retool-based application that supports multi-tiered licenses, automates invoicing workflows, and integrates seamlessly with CRM and accounting platforms to enhance financial data management.
The result:
- Achieved 100% adherence to licensing agreements, mitigating penalties.
- Automated invoicing and workflows reduced manual effort significantly.
- Dashboards and reports improved decision-making and operational visibility.
Retool Dashboards with HubSpot Integration
Our client needed a centralized tool to aggregate account and contact activity, improving visibility and decision-making for the sales team.
The solution
We built a Retool application integrated with HubSpot, QuickMail, and Clay.com. The app features dashboards for sorting, filtering, and detailed views of companies, contacts, and deals, along with real-time notifications and bidirectional data syncing.
The result
- MVP in 50 hours: Delivered a functional application in just 50 hours.
- Smarter decisions: Enabled data-driven insights for strategic planning.
- Streamlined operations: Reduced manual tasks with automation and real-time updates.
Lead Generation Tool to Reduce Manual Work
Our client, Afore Capital, a venture capital firm focused on pre-seed investments, aimed to automate their lead generation processes but struggled with existing out-of-the-box solutions. To tackle this challenge, they sought assistance from our team of Akveo Retool experts.
The scope of work
The client needed a tailored solution to log and track inbound deals effectively. They required an application that could facilitate the addition, viewing, and editing of company and founder information, ensuring data integrity and preventing duplicates. Additionally, Afore Capital aimed to integrate external tools like PhantomBuster and LinkedIn to streamline data collection.
The result
By developing a custom Retool application, we streamlined the lead generation process, significantly reducing manual data entry. The application enabled employees to manage inbound deals efficiently while automated workflows for email parsing, notifications, and dynamic reporting enhanced operational efficiency. This allowed Afore Capital's team to focus more on building relationships with potential founders rather than on administrative tasks.
Retool CMS Application for EdTech Startup
Our client, CutTime, a leading fine arts education management platform, needed a scalable CMS application to improve vendor product management and user experience.
The scope of work
We developed a Retool application that allows vendors to easily upload and manage product listings, handle inventory, and set shipping options. The challenge was to integrate the app with the client’s system, enabling smooth authentication and product management for program directors.
The result
Our solution streamlined product management, reducing manual work for vendors, and significantly improving operational efficiency.
Building Reconciliation Tool for e-commerce company
Our client was in need of streamlining and simplifying its monthly accounting reconciliation process – preferably automatically. But with a lack of time and low budget for a custom build, development of a comprehensive software wasn’t in the picture. After going through the case and customer’s needs, we decided to implement Retool. And that was the right choice.
The scope of work
Our team developed a custom reconciliation tool designed specifically for the needs of high-volume transaction environments. It automated the processes and provided a comprehensive dashboard for monitoring discrepancies and anomalies in real-time.
The implementation of Retool significantly reduced manual effort, as well as fostered a more efficient and time-saving reconciliation process.
Creating Retool Mobile App for a Wine Seller
A leading spirits and wine seller in Europe required the development of an internal mobile app for private client managers and administrators. The project was supposed to be done in 1,5 months. Considering urgency and the scope of work, our developers decided to use Retool for swift and effective development.
The scope of work
Our developers built a mobile application tailored to the needs of the company's sales force: with a comprehensive overview of client interactions, facilitated order processing, and enabled access to sales history and performance metrics. It was user-friendly, with real-time updates, seamlessly integrated with existing customer databases.
The result? Increase in productivity of the sales team and improved decision-making process. But most importantly, positive feedback from the customers themselves.
Developing PoC with Low Code for a Tour Operator
To efficiently gather, centralize, and manage data is a challenge for any tour operator. Our client was not an exception. The company was seeking to get an internal software that will source information from third-party APIs and automate the travel itinerary creation process. Preferably, cost- and user-friendly tool.
The scope of work
Our experts ensured the client that all the requirements could be covered by Retool. And just in 40 hours a new software was launched. The tool had a flexible and easy-to-use interface with user authentication and an access management system panel – all the company needed. At the end, Retool was considered the main tool to replace the existing system.
Testing New Generation of Lead Management Tool with Retool
Our client, a venture fund, had challenges with managing lead generation and client acquisition. As the company grew, it aimed to attract more clients and scale faster, as well as automate the processes to save time, improve efficiency and minimize human error. The idea was to craft an internal lead generation tool that will cover all the needs. We’ve agreed that Retool will be a perfect tool for this.
The scope of work
The project initially began as a proof of concept, but soon enough, with each new feature delivered, the company experienced increased engagement and value.
We developed a web tool that integrates seamlessly with Phantombuster for data extraction and LinkedIn for social outreach. Now, the company has a platform that elevates the efficiency of their lead generation activities and provides deep insights into potential client bases.
Building an Advanced Admin Portal for Streamlined Operations
Confronted with the need for more sophisticated internal tools, an owner of IP Licensing marketplace turned to Retool to utilize its administrative functions. The primary goal was to construct an advanced admin portal that could support complex, multi-layered processes efficiently.
The scope of work
Our client needed help with updating filters and tables for its internal platform. In just 30 hours we've been able to update and create about 6 pages. Following features were introduced: add complex filtering and search, delete records, styling application with custom CSS.
Together, we have increased performance on most heavy pages and fixed circular dependency issues.
Creating MVP Dashboard for Google Cloud Users
Facing the challenge of unoptimized cloud resource management, a technology firm working with Google Cloud users was looking for a solution to make its operations more efficient. The main idea of the project was to create an MVP for e-commerce shops to test some client hypotheses. Traditional cloud management tools fell short.
The scope of work
Determined to break through limitations, our team of developers turned Retool. We decided to craft an MVP Dashboard specifically for Google Cloud users. This wasn't just about bringing data into view; but about reshaping how teams interact with their cloud environment.
We designed a dashboard that turned complex cloud data into a clear, strategic asset thanks to comprehensive analytics, tailored metrics, and an intuitive interface, that Retool provides. As the results, an increase in operational efficiency, significant improvement in cost management and resource optimization.
Elevating CRM with Custom HubSpot Sales Dashboard
Our other client, a SaaS startup, that offers collaborative tools for design and engineering teams, was on a quest to supercharge their sales efforts. Traditional CRM systems were limited and not customizable enough. The company sought a solution that could tailor HubSpot to their workflow and analytics needs.
The scope of work
Charged with the task of going beyond standard CRM functions, our team turned to Retool. We wanted to redefine how sales teams interact with their CRM.
By integrating advanced analytics, custom metrics, and a user-friendly interface, our developers provided a solution that transformed data into a strategic asset.
In 40 hours, three informative dashboards were developed, containing the most sensitive data related to sales activities. These dashboards enable our customer to analyze sales and lead generation performance from a different perspective and establish the appropriate KPIs.
Building a PDF Editor with Low-Code
Our client, a leading digital credential IT startup, needed a lot of internal processes to be optimized. But the experience with low-code tools wasn’t sufficient. That’s why the company decided to hire professionals. And our team of developers joined the project.
The scope of work
The client has a program that designs and prints custom badges for customers. The badges need to be “mail-merged” with a person’s info and turned into a PDF to print. But what is the best way to do it?
Our developers decided to use Retool as a core tool. Using custom components and JavaScript, we developed a program that reduced employees' time for designing, putting the data, verifying, and printing PDF badges in one application.
As a result, the new approach significantly reduces the time required by the internal team to organize all the necessary staff for the conference, including badge creation.